3
A tired three-quarter bath or a full primary suite: one team designs it, waterproofs it, tiles it, and hands it back, typically in 4–8 weeks for a full remodel. The number locks before demolition.
Waterproofing, tile, and finish work stay with our own crew: the parts a bathroom lives or dies on. Plumbing and electrical run through licensed trades we've vetted and manage.
Down to the studs and back.
In-houseCustom tile, frameless glass, linear drains, bench seating.
In-houseOne of the most requested jobs in Colorado Springs.
In-houseFloating or double vanities, floor-to-ceiling tile, heated floors, mirrors and lighting.
In-houseAdding a bath where one doesn't exist, framing through the last fixture.
Licensed tradeBarrier-free showers, grab bars, wider doorways, comfort-height fixtures.
In-house
A walkthrough of what's working and what isn't, plus an honest ballpark on the spot, before anyone signs anything.
Talk to the owner
Tile layouts, fixture selections, and 3D renderings before a thing is touched. Then one locked number, built on the materials you actually chose.

Careful demo, then all the rough-in and the full waterproofing system behind every wet wall, before a single tile goes up.
Industry-best waterproofing systems behind every shower, every time.

Tile, fixtures, vanity, glass, and lighting — every finish element set by our own crew, not day-labor subs. A cosmetic refresh runs 1–2 weeks; a full gut runs 4–8.

A punch-list walkthrough together. We don't close out until every last item is resolved and the room is yours.
Tell us what you're imagining. You'll get a straight read on feasibility, a ballpark range, and a clear next step. If we're a fit, you'll know. If it's out of our lane, we'll say so.