Kitchens · Colorado Springs

The room everyone ends up in.

Full gut-and-rebuild or a smart reconfiguration. Design through final install runs through one team, so the kitchen you approve on paper is the kitchen you cook in. The price locks before demolition, and a mid-range remodel takes 6–10 weeks.

Remodeled Briargate kitchen with quartz waterfall island and globe pendants Opened-up Rockrimmon kitchen with white cabinets and quartz island Flying Horse kitchen with charcoal island and butcher-block top Old North End kitchen with white cabinets and butcher-block island
One team, one price

What a Horizon kitchen includes

Design, cabinetry, tile, and finish are handled by our own crew. Plumbing, electrical, and gas run through licensed trades we've vetted, scheduled and managed by us, not by you.

Cabinetry & layout

Opening up a closed kitchen, adding an island, or reworking the whole footprint.

In-house

Countertops

Quartz, granite, butcher block, or concrete, templated and set by our crew.

In-house

Tile & backsplash

Classic subway or a custom statement wall.

In-house

Appliances & fixtures

Bring your selections or pick with us. Plumbing and gas hookups run through vetted trades.

Licensed trade

Lighting & electrical

Under-cabinet strips, recessed cans, pendants over the island. Prep first, atmosphere second.

Licensed trade

Flooring

Hardwood, tile, or luxury vinyl plank, tied into the main floor so the kitchen flows.

In-house
How it goes

Five steps, no surprises

Modern Colorado kitchen with island and pendant lighting

A conversation

This week

A call or a walkthrough. You get a straight read on what's possible and a ballpark range on the spot, before anyone signs anything.

Talk to the owner
Kitchen island sink with tile backsplash

Design & the locked quote

2–3 weeks

Drawings, selections, and 3D renderings, so you see the kitchen before a wall opens. Then one number in writing: your actual cabinet, counter, and appliance picks priced, not a low allowance that balloons later.

Wide view of modern kitchen with dining area

Ordering

Lead time

Cabinets are the long pole of every kitchen. We don't open a single wall until yours are in our warehouse, so your kitchen isn't sitting torn apart waiting weeks on a back-ordered door.

The mistake that wrecks timelines is demoing before the materials arrive. We don't.

Modern Colorado kitchen with island and pendant lighting

The build

6–10 weeks

Demo, rough-in, cabinets set, then the counter template and the few-day fabrication gap every homeowner is surprised by, then counters in, backsplash, and finish. Dust barriers up, daily updates, home livable. A full gut runs 10–16 weeks.

Kitchen island sink with tile backsplash

Your kitchen back

On the written date

Final walkthrough, punch list closed, and the room everyone ends up in — handed back on the date that was in your contract, not a moving target.

Fair questions

Kitchen questions, answered straight

How long does a kitchen remodel take?
A mid-range remodel runs 6–10 weeks from demolition to walkthrough. A full gut runs 10–16 depending on scope. Your schedule goes in writing before work begins.
Do I need permits in Colorado Springs?
If circuits, plumbing, or gas lines move, yes. We handle the permit process with the City of Colorado Springs and El Paso County.
Can I live at home during the remodel?
Most clients do. We set up dust barriers, keep water running, and clean the site every evening.
Do I need a separate designer?
Design is included. You work with one team from concept through construction, so the drawings already account for what the build costs.
No pressure, no obligation

Start with a conversation.

Tell us what you're imagining. You'll get a straight read on feasibility, a ballpark range, and a clear next step. If we're a fit, you'll know. If it's out of our lane, we'll say so.

We reply within one business day. Your info goes nowhere else.